L.U. Simon

L.U. Simon 2.PNG

Hugh Sheridan

+61 439 207 123

email

website

Ready personnel and the ability to mobilise our own assets in an instant means speed, security and savings. If you need 1000 tonnes of scaffolding, we have it. A dozen luffing cranes or 100 sheds? They’re in the yard. This guarantees that we are not subject to market fluctuations or capital equipment shortages. In the spirit of innovation, we pioneered precast technology, creating the legacy that has enabled clients to design and build cost-effective buildings of over 80 storeys. We are the masters of early handovers which assists clients with significant savings. We were first in introducing a fleet of electric cranes to Melbourne for high-rise apartments and led the way with compact services reticulation, enabling lower floor-to-floor heights, resulting in additional floors within a given height. We also extended the range of economical window walls to greater heights – literally.